HO CHI MINH CITY INVITES INVESTMENT IN 2019

I: 55 BRIDGE – ROAD PROJECTS

1. Building the No. 1 elevated road (from the intersection of the Republic along Cong Hoa – Tran Quoc Hoan – Phan Thuc Duyen – Hoang Van Thu – Phan Dang Luu – Phan Xich Long – Phan Xich Long (extended) – delivered with Dien Bien Phu Street and Ngo Tat To Street – Finish in front of Phu An Bridge). Location: District 1, District 3, Tan Binh District, Binh Thanh District, Phu Nhuan District. Construction scale: 9.5 km long, 17.5 m wide. Total capital: 15,460 billion VND / 703 million USD, agency contacted: HCMC Department of Transport.

2. Building the elevated road No. 3 (from the second line at the constitutional bowl – Le Hong Phong – Ly Thai To – Nguyen Van Cu – North-South axis – Nguyen Van Linh). Location: District 5, District 7, District 10; Construction scale: 8.1 km long. 17.5m wide; Investment form: BOT or BOT combined with BT (BOT priority); Total capital: VND 14,756 billion / 671 million; Contact agency: HCMC Department of Transport.

3. Building the elevated road No. 2 (intersecting with Route 1 at the intersection of Lang Cha Ca – Bui Thi Xuan – Bridge No. 5 on Nhieu Loc – Thi Nghe canal – alley 656 CMT8 – Bac Hai – alley No. 2 Thien Phuoc – alley 654 Au Co – Along Dam Sen Park – Bau Buffalo Creek – Chien Luoc – Huong Lo 2 Road, ending at the intersection with NH1); Location: District 10, District 11, Binh Chanh District; Construction scale: 11.8 km long. 17.5 m wide; Investment form: BOT or BOT combined with BT (BOT priority); Total capital: 21,490 billion VND / 977 million USD, agency contacted: HCMC Department of Transport.

4. Construction of elevated road No. 4 (from NH1 (intersecting with line 5) – Vuon Lai – Crossing Vam Thuot River at the position of Rach Lang and North-South railway (in Cau Den area) – Phan Chu road Trinh planning to extend through My Phuoc apartment area and connect to Dien Bien Phu street, intersect with line 1); Location: District 3, District 12, Binh Thanh District, Go Vap District. Construction scale: 7.3 km long. 17.5m wide; Investment form: BOT or BOT combined with BT (BOT priority); Total capital: 20,300 billion VND / 923 million USD; Contact agency: HCMC Department of Transport.

5. Constructing high way line No. 5 (to coincide with ring road 2 (National Highway 1) from intersection node 2 to An Lac intersection); Location: Thu Duc District, District 12, Hoc Mon District, Binh Tan District. Construction scale: 34km long, 18.5m wide; Investment form: BOT, BOT combined with BT (BOT priority). Total capital: 97,651 billion VND / 4,439 million USD; Contact agency: HCMC Department of Transport.

6. Road connecting Rach Chiec bridge on East Ring road to Binh Thai Intersection. Location: District 9, Thu Duc District. Construction scale: Route length: 3.82 km; cross section of stage 1: 67m. Investment form: BT, PPP and other feasible investment forms. Total capital: 5,732 billion VND / 261 million USD. Contact agency: HCMC Department of Transportation.

7. Upgrading and expanding An Duong Vuong – Phan Anh – Binh Long – Huong Lo 13 roads. Location: District 6, District 8, Binh Tan District, Tan Phu District. Construction scale: 10.65 km long, 06 lanes wide. Total capital: 6,960 Billion VND / 316 Million USD. Contact agency: HCMC Department of Transportation.

8. Upgrade, expand Provincial Highway 15 (from Provincial Road 7 Bridge to Ben Suc Bridge). Location: Cu Chi District. Construction scale: 10,58km. 35m wide. Investment form: BOT, BOT combined with BT (BOT priority). Total capital: 2,536 Billion VND / 115 Million USD. Contact agency: HCMC Department of Transportation.

9. Upgrading and expanding Provincial Highway 15 (from the Northeast road of Tan Chanh Hiep to Bau fork). Location: District 12. Construction scale: 1,919 km long. 35m wide. Investment form: BOT, BOT combined with BT (BOT priority). Total capital: 714 Billion VND / 32 Million USD. Contact agency: HCMC Department of Transportation.

10. Upgrading and expanding Provincial Highway 15 in Cu Chi district (from Xang bridge to Ben Suc bridge) Location: Cu Chi District. Construction scale: 35 km long, 35m wide. Investment form: BOT or BOT combined with BT

(BOT priority). Total capital: 6,000 Billion VND / 273 Million USD. Contact agency: City Department of Transportation HCM.

11. Constructing Parallel road with Nguyen Van Tao road. Location: Nha Be District. Construction scale: 4.5 km long, 60m wide. Investment form: BT (mainly exploiting land). Total capital: 1,952 Billion VND / 89 Million USD Contact agency: HCMC Department of Transportation.

12. Build Nguyen Van Linh intersection – National Highway 50, Binh Chanh district. Location: Binh Chanh District. Total capital: 738 Billion VND / 34 Million USD. Contact agency: Urban traffic management area No. 4.

13. Constructing a centripetal road in the northwest (from Long An boundary to Vinh Loc industrial zone). Location: Binh Tan district, Binh Chanh district. Construction scale: 8 km long. Investment form: BT (mainly exploiting land fund). Total capital: 5,000 Billion VND / 227 Million USD. Contact agency: HCMC Department of Transportation.

14. Build Nguyen Van Linh – Pham Hung, Binh Chanh district intersections. Location: Binh Chanh District. Total capital: 753 Billion VND / 34 Million USD. Contact agency: Urban traffic management area No. 4.

15. Build intersection of Ba Diem intersection (Highway 1A and Phan Van Hon district). Location: District 12, Hoc Mon District. Construction scale: Length 246 m, width 18.6 m. Total capital: 408 Billion VND / 19 Million USD. Contact agency: Urban traffic management zone No. 3.

16. Build Nguyen Van Linh – Nguyen Luong Bang intersection, District. Location: District 7. Total capital: 738 Billion VND / 36 Million USD. Contact agency: Urban traffic management area No. 4.

 17. Building Nguyen Van Linh intersection – National Highway 1A, Binh Chanh district. Location: Binh Chanh District. Total capital: 775 Billion VND / 35 Million USD. Contact agency: Urban traffic management area No. 4.

18. Construction of Thoi An – Thanh Xuan inter-ward road (line 1). Location: District 12. Construction scale: 3.4 km long; 30 m wide. Total capital: 1,268 Billion VND / 58 Million USD. Contact agency: Urban traffic management area No. 3.

19. Upgrading and expanding Ho Hoc Lam Street, District 8 and Binh Tan District. Location: District 8, Binh Tan. Construction scale: 1.5 km long; 42m wide. Total capital: 980 Billion VND / 45 Million USD. Contact agency: Urban traffic management area No. 4.

 20. Constructing a radial road connecting Dong Van Cong road with Vanh Dai 2 road (Ward 1). Location: District 2. Construction scale: 2.24 km long; 30m wide. Investment form: BT. Total capital: 200 Billion VND / 9 Million USD.

 21. Build intersection Kho B on Nguyen Huu Tho street. Location: Nha Be District. Construction scale: Length of line 436m. Total capital: 800 Billion VND / 36 Million USD. Contact agency: Urban traffic management area No. 4.

 22. Building Metro Line No. 2 (Phase 2) (Ben Thanh – Thu Thiem section and Tham Luong section – Tay Ninh Bus Station – Northwest Cu Chi Urban Area. Location: District 01, 02, 12, Cu District) Chi and Hoc Mon District Investment form: PPP (BOT, BOT combined) Total capital: 18.321 Billion VND / 833 Million USD Contact agency: Urban Railway Management Board.

23. Intersection at the foot of the road leading to An Ha bridge. Location: Northwest Area. Investment form: PPP – BT contract. Total capital: 603 Billion VND / 27 Million USD. Contact agency: Management Board of Northwest Urban Area.

24. Build Metro Line 3A (Ben Thanh – Tan Kien Station). Location: District 1, 3, 5, 6, Binh Chanh District. Investment form: PPP (BOT, BOT combined with BT). Total capital: 66,444 billion VND / 3,020 million USD. Contact agency: Urban Railway Management Board.

 25. Building Tam Tan road. Location: Northwest Area. Investment form: PPP – BT contract. Total capital: 6,110 Billion VND / 278 Million USD. Contact agency: Management Board of Northwest Urban Area.

26. Build Metro Line No. 3B (Cong Hoa 6 intersection – Hiep Binh Chanh). Location: District 1, 3, Binh Thanh District and Thu Duc District. Investment form: – ODA, PPP (BOT, BOT combined BT). The project has been included in the list of projects using concessional loans of the Government of Japan, in the 2013-2015 period (Official Letter No. 430 / UBND-QLDA dated January 23, 2015 of the City People’s Committee). Total capital: 41,556 Billion VND / 1,889 Million USD Contact agency: Urban Railway Management Board.

27. Construction of Metro Line 6 (Ba Qu Turn – Phu Lam Roundabout). Location: District 6, Tan Binh, Tan Phu. Investment form: ODA, PPP (BOT or BOT combined with BT). Total capital: 29,260 Billion VND / 1,330 Million USD; Contact agency: Urban Railway Management Board.

28. Construction of Metro Line No. 4 (Thanh Xuan – Hiep Phuoc Urban Area) Location: District 1, 4, 7, 12, Go Vap, Phu Nhuan, and Nha Be District. Investment form: PPP (BOT, BOT combined with BT). Total capital: 77,700 Billion VND / 3,532 Million USD. Contact agency: Urban Railway Management Board.

 29. Construction of Monorail Line No. 2. Location: Binh Thanh District, District 7, District 2, Thu Duc District. Investment form: PPP (BOT or BOT combined with BT), ODA. Total capital: 15,730 Billion VND / 715 Million Contact agency: Urban Railway Management Board.

 30. Construction of Metro Line 4B (Gia Dinh Park Station – Lang Cha Ca Station). Location: Go Vap District, Tan Binh District. Investment form: PP Capital: 23,100 billion VND / 1,050 million USD. Contact agency: Urban Railway Management Board.

31. Investment project on construction of Monorail line No.3 (Phan Van Tri and Nguyen Oanh crossroads – Tan Chanh Hiep station). Location: Go Vap District, District 12. Investment form: PPP. Total capital: 8,800 Billion VND / 400 Million USD. Contact agency: Urban Railway Management Board.

32. Construction of Metro Line 5 (Phase 2). Location: Bay Hien crossroads – Can Giuoc new bus station and depot Da Phuoc. Investment form: PPP Total capital: 35,245 Billion VND / 1,602 Million USD. Contact agency: Urban Railway Management Board.

33. Construction of Gia Dinh Park parking lot (zone D). Location: Go Vap district. Investment form: BOT. Total capital: 174 Billion VND / 8 Million USD. Contact agency: Department of Transportation.

34. Construction of Gia Dinh Park parking lot (03 QH positions); Location: Go Vap district. Investment form: BOT. Total capital: 107 Billion VND / 5 Million USD. Contact agency: HCMC Department of Transport.

35. Construction of internal roads connecting Channel 5 – Canal 7. Location: Northwest urban area of ​​the city, Cu Chi district. Investment form: BT. Total capital: 238.26 Billion VND / 11 Million USD. Contact agency: Management Board of Northwest Urban Area.

36. Upgrading and expanding Duong Cong Khi street. Location: Hoc Mon district. Construction scale: length of 6,905km, Cross section: 30m. Investment form: BT. Total capital: 551 Billion VND / 25 Million USD. Contact agency: HCMC Department of Transport.

37. Road connecting Binh Thai intersection to Pham Van Dong road; Location: Thu Duc District. Construction scale: Route length: 1,989km; Cross section: stage 1: 67m. Investment form: BT. Total capital: 1.324 Billion VND / 60 Million USD. Contact agency: HCMC Department of Transport.

38. Road construction along Canal 5. Location: Northwest urban area of ​​the city, Cu Chi district. Investment form: BT. Total capital: 768.67 Billion VND / 35 Million USD. Contact agency: Management Board of Northwest Urban Area.

39. Road connecting An Lac intersection to Nguyen Van Linh road. Location: Binh Tan District, District 8, Binh Chanh District. Construction scale: 02 lanes on each side with a length of about 5.3 km, Cross section: 60m. Investment form: BT. Total capital: 6,500 Billion VND / 295 Million USD. Contact agency: HCMC Department of Transport

40. Vertical road construction of Canal 7. Location: Northwest urban area of ​​the city, Cu Chi district. Investment form: BT. Total capital: 964.49 Billion VND / 44 Million USD. Contact agency: Management Board of Northwest Urban Area.

41. Build roads along the Saigon River. Location: Binh Thanh District, District 1. Investment form: BT. Total capital: 696 billion VND / 32 Million USD. Contact agency: HCMC Department of Transport.

42. Repairing and upgrading Trinh Thi Tam road (new provincial road 15). Location: Hoc Mon District. Construction scale: 6km long, 35m wide. Total capital: 512 Billion VND / 23 Million USD. Contact agency: HCMC Department of Transport.

43. Upgrading National Highway 50 in HCM City. Location: Binh Chanh Construction scale: 8.3 km long; 31 m wide. Total capital: 2,600 Billion VND / 118 Million USD. Contact agency: HCMC Department of Transport.

44. Upgrade Provincial Road 15 (from Xang bridge to Ben No bridge). Location: Cu Chi district. Construction scale: 11.9 km long, 35m wide. Investment form: BOT or BOT combined with BT. Total capital: 3,119 Billion VND / 142 Million USD. Contact agency: HCMC Department of Transport.

45. Ring Road 3, section 1 (component project 2b). Location: Nhon Trach – Dong Nai, District 9 – HCMC. Construction scale: 08 lanes for motor vehicles and 02 sections on parallel roads (12m on each side). Length of 9.4 km. Total capital: 3,772 Billion VND / 171 Million USD Contact agency: HCMC Department of Transport

 46. ​​Upgrading and expanding Provincial Highway 15 (from Ben bien bridge to Provincial Road 7 bridge). Location: Cu Chi district. Construction scale: 10.45 km long, 35m wide Investment form: BOT or BOT combined with BT. Total capital: 2,828 Billion VND / 129 Million USD. Contact agency: HCMC Department of Transport.

47. Ring Road 3, Section 3 (Binh Chuan – National Highway 22). Location: Binh Chuan – Binh Duong, Chu Chi district – Ho Chi Minh City. Construction scale: 06 lanes for motor vehicles and 02 sections on parallel roads (12m on each side). Line length of 24.7km Total capital: 29,500 Billion VND / 1,341 Million USD Contact agency: HCMC Department of Transport.

48. Highway 22 (Xuyen A road). Location: District 12, Hoc Mon District, Cu Chi District is located in Ho Chi Minh City and Tay Ninh Province. Construction scale: Total length of the route is about 58.25km, 60m across. Total capital: VND 9.505 billion / 432 million USD. Contact agency: HCMC Department of Transport.

49. Thu Thiem 3 Bridge and widening Ton Dan Street, District 4. Location: District 2, District 4. Construction scale: The entire route is 1,950m long, 6 lanes wide. Total capital: 5,760 Billion VND / 262 Million USD. Contact agency: HCMC Department of Transport.

50. Thu Thiem Bridge 4. Location: District 2, District 7. Construction scale: The total length of the project is about 2.160m. Total capital: 3.356 billion VND / 153 million USD. Contact agency: HCMC Department of Transport.

51. Cat Lai Bridge. Location: Nhon Trach District, Dong Nai Province, District 2, Ho Chi Minh City. Construction scale: Total length of the whole route: 3km; bridge length: 3,392 km; Total capital: 7,449 Billion VND / 339 Million USD. Contact agency: HCMC Department of Transport.

52. Walking bridge. Location: District 1, District 2. Construction scale: Length 260-360m. Investment form: BT contract form. Total capital: 968 Billion VND / 44 Million USD. Contact agency: Thu Thiem New Urban Area Investment and Construction Management Board, District 2.

53. Building a warehouse intersection B on Nguyen Huu Tho street. Location: District 7. Construction scale: 286m long, 2 ends of the bridge, 150m long, 48m wide. Total capital: 800 Billion VND / 36 Million USD. Contact agency: HCMC Department of Transport.

54. Can Gio Bridge. Location: Nha Be District, Can Gio District. Construction scale: Total length of the whole route: 5.8km. Total capital: 5,904 Billion VND / 268 Million USD. Contact agency: HCMC Department of Transport.

55. Saigon river road, (from Thi Nghe canal to Tan Cang residential area). Location: District 1, Binh Thanh District. Construction scale: Line length 1.150m, 35m cross section. Total capital: 600 Billion VND / 27 Million USD. Contact agency: HCMC Department of Transport.

II: 7 WATERWAY TRANSPORT PROJECT

1. Dredging Rach Chiec route. Location: District 9. Construction scale: – Dredging length is about 6.6Km; bottom width B = 36m; Depth running H = 3.5m. Total capital: 800 Billion VND / 36 Million USD. Contact agency: HCMC Department of Transport.

2. Dredging Giong Ong To canal – Rach Dong Trong – Rach Chiec. Location: District 2. Total capital: 1,000 Billion VND / 45 Million USD. Contact agency: HCMC Department of Transport.

3. Dredging the route of Trau Luu Creek canal. Location: District 9. Construction scale: – Length of dredging is about L = 6.3Km; bottom width B = 36m; Total capital: 430 Billion VND / 20 Million USD. Contact agency: HCMC Department of Transport.

4. Dredging the Rach Tra – Kenh Xang – An Ha – Kenh Xang Lon axis and opening the existing An Ha culvert. Location: Binh Chanh, Hoc Mon and Cu Chi districts. Total capital: 4,500 Billion VND / 205 Million USD. Contact agency: HCMC Department of Transport.

5. Dredging the opening of the Tac Tac route. Location: District 9. Construction scale: – Length of dredging is about 10.8 km; bottom width B = 36m; Depth of running train H = 3.5m. Total capital: 951 Billion VND / 43 Million USD. Contact agency: HCMC Department of Transport.

6. The Port Area. Location: Lot PO, Gia Nhieu river, District 9. Construction scale: Port scale: Inland waterway port type II. Investment form: Calling domestic and foreign investment. Contact agency: High-tech Zone Management Board.

7. Dredging two routes of Rach Mon – Song Kinh and Ba Da – Rach Christmas, District 9 and newly constructing Cay Me bridge on Long Thuan road, Dinh bridge on Long Thuan road extended. Location: District 9. Construction scale: The total length of dredging is 3,51km. Total capital: 714 Billion VND / 32 Million USD. Contact agency: HCMC Department of Transport.

 III: 8 INTERNAL RAILWAY PROJECTS

 1. Ground tram line 1. Location: Binh Tan District, District 6, District 5, District 1. Construction scale: 12.8 km long. Total capital: 12,500 Billion VND / 568 Million USD. Contact agency: HCMC Department of Transport.

2. Urban railway line number 3A. Location: District 1, 3, 5, 6, Binh Chanh District. Construction scale: About 19.8km long, Tan Kien depot. Total capital: 62,040 Billion VND / 2,820 Million USD. Contact agency: HCMC Department of Transport.

3. Construction of the tram line No. 2. Location: District 2, District 7, Binh Chanh District. Construction scale: 27.2 km long. Total capital: 15,730 Billion VND / 715 Million USD. Contact agency: HCMC Department of Transport.

4. Urban railway No. 3B. Location: District 1, 3, Binh Thanh, Thu Duc. Construction scale: About 12.1 km long. Total capital: 41,140 Billion VND / 1,870 Million USD. Contact agency: Ho Chi Minh City Department of Transportation.

5. Construction of the tram line 3. Location: District 12, Go Vap District. Construction scale: 16.5 km long. Total capital: 8,800 Billion VND / 400 Million USD. Contact agency: HCMC Department of Transport.

6. Urban railway line No. 4A. Location: District 12, Go Vap, Phu Nhuan, 1, 4, 7, Nha Be district. Construction scale: About 36.2 km long; Total capital: 73,260 Billion VND / 3,330 Million USD. Contact agency: HCMC Department of Transport.

 7. Line 2 urban railway (Phase 2). Location: District 1, 2, 12, Hoc Mon District, Cu Chi District. Construction scale: total length of about 9.01km. Total capital: 18,925 Billion VND / 860 Million USD. Contact agency: HCMC Department of Transport.

 8. Urban railway No. 4B. Location: Go Vap District, Tan Binh District. Construction scale: About 5.2km long. Total capital: 24,200 billion VND / 1,100 million USD. Contact agency: HCMC Department of Transport.

IV: 15 INTERNAL ROAD PROJECT

 1. Road parallel Phan Van Hon. Location: Hoc Mon District. Construction scale: 9.0km long; MCN road 30m, MCN bridge 26m. Total capital: 2,662 Billion VND / 121.00 Million USD. Contact agency: HCMC Department of Transport.

 2. Rung Rung Road. Location: Can Gio District. Construction scale: Total length of route: 36.5km, MCN meets 06 lanes. Total capital: 2,168 Billion VND / 99 Million USD. Contact agency: HCMC Department of Transport.

 3. Tran Dai Nghia Street (from the intersection with National Highway 1A to Long An province). Location: Binh Chanh District. Construction scale: 22.8 km long; Total capital: 4,535 Billion VND / 206,14 million USD. Contact agency: HCMC Department of Transport.

4. Le Van Luong Street (section from Nguyen Van Linh street to Rach Doi bridge, not including Rach Dia bridge, Long Kieng bridge and bridge leading road). Location: Nha Be District. Construction scale: Cross section of bridge 15m, cross section of 10m road (QH: 40m). Total capital: 5,716 Billion VND / 260 Million USD. Contact agency: HCMC Department of Transport.

5. North – South trunk road (phase 2). Location: District 4. Construction scale: Total length of route: 3.73km; MCN: 8-10 lanes. Total capital: 6,745 Billion VND / 307 Million USD. Contact agency: HCMC Department of Transport.

6. Road parallel to Highway 50 (connecting Ho Chi Minh City with Long An province). Location: H.Binh Chanh and Long An province. Construction scale: Total length of about 8.6km. Total capital: 3,816 Billion VND / 173 million USD. Contact agency: HCMC Department of Transport.

7. North – South trunk road (phase 3). Construction scale: Total length of 7.5 km, cross section from 60-68.75m. Total capital: 5,453 billion VND / 248 million USD. Contact agency: HCMC Department of Transport.

8. Saigon River Road (section from Ham Long Art Village Project to Phu My Bridge). Contact agency: District 2 People’s Committee

9. The road parallel north along the highway HCMC – Long Thanh – Dau Giay. Contact agency: District 2 People’s Committee.

 10. Expanding National Highway 13. Location: Hiep Binh Chanh Ward and Ward Hiep Binh Phuoc. Construction scale: National highway 13 expansion as planned; Investment form: BT. Total capital: 6,500 Billion VND / 295 Million USD. Contact agency: HCMC Department of Transport.

 11. Do Xuan Hop street, road 30: 40m (the section from Xuyen Tam road to Nam Ly bridge). Contact agency: District 2 People’s Committee

 12. Upgrade and expand Nguyen Anh Thu street (from To Ky to Le Van Khuong). Location: District 12. Construction scale: 4.7km long, 40m wide. Total capital: 3.163 Billion VND / 144 Million USD. Contact agency: HCMC Department of Transport.

 13. Expand and upgrade Nguyen Thi Lanh street. Location: The section through Saigon Safari Park. Construction scale: Already approved QH 1/2000. Contact agency: Department of Planning and Investment.

14. Constructing Thoi An – Thanh Xuan inter-ward road (line 1). Location: District 12. Construction scale: 4,507m long, 30m wide. Total capital: 1,760 Billion VND / 80 Million USD. Contact agency: HCMC Department of Transport.

15. Expand and upgrade Tam Tan road. Location: Section of the project of Northwest Urban Area. Construction scale: Already approved QH 1/2000. Contact agency: Management Board of urban area in the Northwest of Ho Chi Minh City.

V: 4 PARKING PROJECT

1. Underground parking at Tao Dan Park. Location: District 1

Total capital: 964 Billion VND / 44 Million USD. Contact agency: HCMC Department of Transport.

2. Passenger bus station at Cho Lon bus station. Location: District 5; Total capital: 1,100 Billion VND / 50 Million USD. Contact agency: HCMC Department of Transport.

3. Underground parking at Hoa Lu stadium. Location: District 1; Total capital: 3,171 Billion VND / 144 Million USD. Contact agency: HCMC Department of Transport.

4. Tan Phu bus parking lot. Location: Tan Phu District. Total capital: 65 Billion VND / 3 Million USD. Contact agency: HCMC Department of Transport.

VI: 28 URBAN INFRASTRUCTURE PROJECT

1. Duong Cong Khi Industrial Complex. Location: Xuan Thoi Thuong Commune, Hoc Mon District. Investment form: PPP. Contact agency: HCMC Department of Industry and Trade.

2. System of wastewater collection and treatment in three basins: Tan Hoa – Lo Gom, Binh Tan and western Saigon. Location: Area in the West of the City. Total capital: 7,042 Billion VND / 320 Million USD. Contact agency: HCMC Department of Transport.

3. Constructing northern Saigon 1 wastewater treatment plant (status: investors have proposed projects; only calling for investment in the bidding phase). Location: Binh Tan District. Investment form: BT. Total capital: 2,700 Billion VND / 123 Million USD. Contact agency: HCMC Department of Industry and Trade

4. South Saigon wastewater treatment plant (basin No. 4). Location: District 7, Nha Be district. Total capital: 4,500 Billion VND / 205 Million USD. Contact agency: HCMC Department of Transport.

5. Collection system and wastewater treatment plant for Tan Hoa – Lo Gom basin. Location: Area in the West of the City. Total capital: 5.100 Billion VND / 232 Million USD. Contact agency: HCMC Department of Transport.

6. North Saigon wastewater treatment plant 2. Location: District 9. Total capital: 3,900 Billion VND / 177 Million USD. Contact agency: HCMC Department of Transport

7. Binh Tan wastewater treatment plant. Location: Binh Tan District. Construction scale: BT. Total capital: 6,500 Billion VND / 295 Million USD. Contact agency: HCMC Department of Transport.

8. Northern Sai Gon 1 wastewater treatment plant (basin No. 7). Location: Thu Duc District. Total capital: 6,000 Billion VND / 273 Million USD. Contact agency: HCMC Department of Transport.

9. West Saigon wastewater treatment plant. Location: District 12. Total capital: 2,400 Billion VND / 109 Million USD. Contact agency: HCMC Department of Transport.

10. Northwest wastewater treatment plant (basin No. 12). Location: Cu Chi District. Total capital: 3.600 Billion VND / 164 Million USD. Contact agency: HCMC Department of Transport.

11. Drainage system and waste water treatment plant in the western region. Location: Area in the West of the City. Total capital: 11,300 billion VND / 514 million USD. Contact agency: HCMC Department of Transport.

12. Central and residential area in the West of the City. Location: Tan Kien Commune, Binh Chanh District. Contact agency: Binh Chanh District People’s Committee.

 13. Dredging, improving the environment, constructing infrastructure and exploiting land along Xuyen Tam canal. Location: Xuyen Tam canal (Binh Thanh district, Go Vap district). Total capital: 5,106 Billion VND / 232 Million USD. Contact agency: HCMC Department of Transport.

14. Project on compensation for land clearance and resettlement for planting isolated trees in the waste treatment complex and Da Phuoc cemetery. Location: Waste treatment complex and Da Phuoc cemetery. Total capital: 1,069 Billion VND / 49 Million USD. Contact agency: Department of Finance; Department of Planning and investment.

15: Solid waste treatment project by electric breakthrough technology in the area. Location: Tay Bac Solid Waste Treatment Complex, Cu Chi District, Ho Chi Minh City. Total capital: 4,370 Billion VND / 199 million USD. Contact agency: Department of Natural Resources and Environment.

16. Project on planting isolated green trees in the solid waste treatment complex and Da Phuoc cemetery. Location: Waste treatment complex and Da Phuoc cemetery. Total capital: 90 Billion VND / 4 Million USD. Contact agency: Department of Finance; Department of Planning and investment.

17. Construction of sidewalks and drainage systems on trans-Asia roads (from An Suong to the beginning of Tay Ninh province). Location: District 12, Hoc Mon and Cu Chi districts. Construction scale: 30km long, 40-42m wide. Total capital: 1,000 Billion VND / 45 Million USD.

18. Project for compensation and clearance for phase 2 to plant isolated trees in the northwest solid waste treatment complex, Cu Chi district. Location: Northwest City Solid Waste Treatment Complex, Cu Chi District. Total capital: 526 Billion VND / 24 Million USD. Contact agency: Department of Finance; Department of Planning and investment.

19. Project on planting isolated green trees in the Northwest City solid waste treatment complex, Phase 2. Location: Northwest City solid waste treatment complex. Total capital: 70 Billion VND / 3 Million USD. Contact agency: Department of Department; District People’s Committee; Relevant units called for investment in public waste bins, public toilets on the river, and rivers to meet the needs of preserving the environment. Total capital: 600 Billion VND / 27 Million USD; Contact agency: Department of Department; District People’s Committee; Related units.

20. Project on compensation and clearance for phase 3 to plant isolated trees in the Northwest solid waste treatment complex, Cu Chi district. Location: Northwest City Solid Waste Treatment Complex, Cu Chi District. Total capital: 350 Billion VND / 16 Million USD. Contact agency: Department of Department; District People’s Committee; Related units.

21. Project of synchronous investment in equipment for collection, transportation and transfer of solid wastes for daily life activities in the city. Total capital: 2,000 Billion VND / 91 Million USD. Contact agency: Department of Department; District People’s Committee; Related units.

23. Deployment of salvage operations, treatment of water hyacinth flow through the Saigon river, Dong Nai river, river and winter grass and canals bordering Ho Chi Minh City and neighboring provinces such as Binh Duong, Dong Nai, Long An and Tay Ninh. Location: Saigon River, Dong Nai River, Vam Co Dong River and canals bordering Ho Chi Minh City and neighboring provinces such as Binh Duong, Dong Nai, Long An and Tay Ninh. Total capital: 110 Billion VND / 5 Million USD. Contact agency: Department of Department; District People’s Committee; Related units.

24. Project to recycle industrial waste and hazardous waste treatment at the city’s waste treatment complexes. Location: City’s waste treatment complex. Total capital: 1,470 Billion VND / 67 Million USD. Contact agency: Department of Department; District People’s Committee; Related units.

25. Northwestern branch of hazardous industrial solid waste treatment area. Location: Cu Chi District. Construction scale: 100 ha. Total capital: 954 Billion VND / 43 Million USD. Contact agency: Infrastructure Department, Ministry of Construction, 37 Le Dai Hanh, Hanoi.

26. Upgrading Hoc Mon irrigation system – North Binh Chanh. Location: Hoc Mon District, Binh Chanh and Tan Binh District. Total capital: 485 Billion VND / 22 Million USD. Contact agency: No. 21 Irrigation Service Exploitation Management Company Limited.

27. Project to charge traffic cars into the city center to limit traffic congestion. Total capital: 1,557 Billion VND / 71 Million USD. Contact agency: HCMC Department of Transport.

28. Calling for investment in public waste bins, public toilets on the ground, on the river to meet the needs of preserving the environment. Total capital: 600 Billion VND / 27 Million USD. Contact agency: Department of Department; District People’s Committee; Related units.

VII: 4 PROJECTS REDUCE FLOODING

1. Phase 3 City Water Environment Improvement Project Location: Ward 7 area, District 8: 200 ha, District 7 area: 1,400 ha, Doi – Te canal basin in districts 4, 7, 8. Figure Investment method: ODA, PPP, Total capital: 18,804 Billion VND / 855 Million USD. Contact agency: Investment Management Board of Urban Transport Construction No. 3.

2. The Rach Tra tide control project. Location: Cu Chi district, Hoc Mon district; Investment form: ODA, PPP… Total capital: 1,122 Billion VND / 51 Million USD. Contact agency: HCMC Department of Transport.

3. Dredging project of Soai Rap channel (phase 3). Total capital: 8,977 Billion VND / 408 Million USD. Contact agency: HCMC Department of Transport

4. Project to prevent landslides in Thanh Da peninsula. Location: Binh Thanh District. Investment form: ODA, PPP, Total capital: 1,000 Billion VND / 45 Million USD. Contact agency: HCMC Department of Transport.

 VIII: 2 Agriculture projects

1. Investment project of City Fisheries Center in Can Gio district. Location: Can Gio district Investment form: PPP, … Total capital: 1,200 Billion VND / 55 Million USD. Contact agency: HCMC Department of Agriculture and Rural Development.

2. Investment project on construction of high-tech Agriculture zone in the fisheries sector of Can Gio district Location: Hao Vo area, Long Hoa commune, Can Gio district, Ho Chi Minh City. Investment form: FDI and other forms proposed by Investors … Total capital: 400 Billion VND / 18 Million USD. Contact agency: Management Board of High-Tech Agriculture Zone.

IX: 9 COMMERCIAL PROJECTS – SERVICES

1. Trade Center – Service and Technical support. Location: District 9. Investment form: Calling domestic and foreign investment. Contact agency: HCM City Hi-tech Park Management Board

2. High-rise housing area combined with Trade – Service (area 10/2 An Duong Vuong ward 10, District 6). Location: District 6. Investment form: Form of land use right auction. Contact agency: District 6 People’s Committee.

3. Center for Exhibition, Purchase, Trading, Landscape Fair at Flower Village Park, Go Vap District (phase 2). Location: Go Vap District. Investment form: Direct investment of 100% investor’s capital. Contact agency: Go Vap District Economic Department (Ms Lan)

4. Mixed-use commercial residential area project at land lots with 1-1 symbol; 1-2; 1-3; 1-4; 1-5; 1-6; 1-8; 1-9; 1-10 belongs to functional area No. 1. Location: District 2. Scale: Area: 77.606.4 m2. Construction floor area of ​​632,500 m2. Contact agency: Management Board of Thu Thiem Area.

5. Project of Complex 621 Pham Van Chi, Ward 7, District 6. Location: District 6́. Investment form: auction of land use rights. Total capital: 16,382 billion VND / 745 million USD. Contact agency: HCMC Department of Planning and Investment.

6. The house fund of 2,220 apartments is built at plots r1, r2, r3, Binh Khanh ward. Location: District 2. Scale: – Land area: 46,971 m2 – Construction floor area: 315,346 m2. Contact agency: Management Board of Thu Thiem Area.

7. High-rise housing area combined with Trade – Service (area 701/2 Kinh Duong Vuong ward 12, District 6). Location: District 6. Investment form: auction of land use rights Contact agency: District 6 People’s Committee.

8. The house fund of 1,570 apartments was built at land lots r4, r5 in Binh Khanh ward. Location: District 2. Scale: Area: 31,852 m2. Construction floor area is 159,112 m2. Contact agency: Management Board of Thu Thiem Area.

9. Banking and Commercial Finance Center, Services at Lot 1-7 and 1-11 in functional area No. 1. Location: District 2. Scale: Project development land area: 14,461 m2. Construction floor area is about 220,000 m2. Contact agency: Management Board of Thu Thiem Area.

X: 29 URBAN EMBELLISHMENT PROJECT

1. Urban embellishment and construction of high-rise condominiums in the remaining area of ​​ward 11. Location: Ward 11, District 8. Investment form: FDI and other forms. Total capital: 15,052 Billion VND / 684 Million USD. Contact agency: District 8 People’s Committee.

2. Urban embellishment and construction of high-rise condominiums at the end of Ta Quang Buu road. Location: Ward 6, District 8. Investment form: FDI and other forms. Total capital: 1.018 Billion VND / 46 Million USD. Contact agency: District 8 People’s Committee.

3. Embellishment of urban areas, construction of houses, high-rise apartments Blown Gas, ward 1. Location: Ward 1, District 8. Investment form: FDI and other forms. Total capital: 7,038 Billion VND / 320 Million USD. Contact agency: District 8 People’s Committee.

4. Investing in an office building for rent or for self-use purposes in the leased land of Quang Trung Software Park. Location: Quang Trung Software Park, Tan Chanh Hiep Ward, District 12, Ho Chi Minh City. Investment form: FDI – foreign investment. Total capital: 220 Billion VND / 10 Million USD. Contact agency: Quang Trung Software Park One Member Limited Company.

5. Urban embellishment and construction of houses, high-rise apartments Cau Chu Y Investment Zone, Ward 8. Location: Ward 8, District 8. Investment form: FDI and other forms. Total capital: 6,021 billion VND / 274 million USD. Contact agency: District 8 People’s Committee.

6. Embellishment of regional urban areas at the end of Ta Quang Buu street, Ward 6. Location: Ward 6, District 8 Investment form: ODA, PPP, BOT, FDI Socialization. Total capital: 1.018 Billion VND / 46 Million USD. Contact agency: District 8 People’s Committee.

7. Embellishment of urban areas, construction of high-rise apartment buildings in the South of East-West Highway – Rach Ruoi Horse. Location: Ward 16, District 8. Investment form: FDI and other forms. Total capital: 5,024 Billion VND / 228 Million USD. Contact agency: District 8 People’s Committee.

 8. Building a Theme Park in the Northwest Urban Area of ​​the City. Location: Northwest urban area. Investment form: Socialization. Contact agency: Management Board of Northwest Urban Area

 9. Urban Correction Ward 15. Location: Ward 15, District 8. Investment form: FDI and other forms. Total capital: 5,024 Billion VND / 228 Million USD. Contact agency: District 8 People’s Committee.

10. Construction of Apartment Lot IV-VI Apartment in Thanh Da Residential. Location: P.27, Bình Thạnh District. Investment form: FDI and other forms. Total capital: 2,069 Billion VND / 94 Million USD. Contact agency: HCMC Department of Construction.

11. Construction of Resettlement Area and Business of high-rise apartment building in residential area south of Ring Road No. 02. Location: Ward 7, District 8. Investment form: FDI and other forms. Total capital: 1.505 Billion VND / 68 Million USD. Contact agency: District 8 People’s Committee.

12. Residence for workers. Location: Ward Long Thanh My, District 9. Investment form: Calling domestic and foreign investment. Contact agency: HCMC Hi-tech Park Management Board

13. Construction project of Binh Chanh Electricity. Location: H. Bình Chánh. Investment form: FDI and other forms. Total capital: 1,217 Billion VND / 55 Million USD. Contact agency: HCMC Department of Construction

14. Green plate. Location: Cluster G in HCM City Hi-tech Park. Investment form: Calling domestic and foreign investment. Contact agency: HCMC Hi-tech Park Management Board

15. Construction investment project of Tan Tao – Khu b residential area, Tan Tao A ward, Binh Tan district. Location: Tan Tao A Ward, Binh Tan District. Investment form: FDI and other forms. Contact agency: HCMC Department of Construction.

16. Project on renovation and embellishment of coastal houses and on Van Thanh canal. Location: 2 on the bank of Van Thanh canal from Dien Bien Phu bridge to Nhieu Loc – Thi Nghe fork. Investment form: PPP. Total capital: 650 Billion VND / 30 Million USD. Contact agency: People’s Committee of Binh Thanh District.

17. Construction of Resettlement Area to serve Northwest Urban Area. Location: Northwest urban area; Investment form: PPP and other forms. Total capital: 714 Billion VND / 32 Million USD. Contact agency: Management Board of Northwest Urban Area.

18. Resettlement of cluster 08 Apartment lot of Thanh Da apartment, Ward 27. Location: Cluster of 08 condominiums Lot Lot, Thanh Da, Ward 27. Contact agency: People’s Committee of Binh Thanh District.

19. Binh Khanh Cemetery construction project. Location: Ap Binh Loi, Binh Khanh commune, Can Gio district. Investment form: ODA, PPP, BOT, FDI or other forms. Contact agency: People’s Committee of Can Gio District.

20. Resettlement of cluster 15 Block of apartment block in Cu Da Thanh Da ward, Ward 27. Location: Cluster of 15 lots of apartments with lots of houses in Thanh Da, Ward 27. Contact agency: People’s Committee of Binh Thanh District.

21. Resettlement Bank Apartment No. 18 Phan Chu Trinh, Ward 2. Location: Bank Apartment No. 18 Phan Chu Trinh, Ward 2. Contact agency: People’s Committee of Binh Thanh District.

22. Resettlement of Hoa Binh School Building, Ward 19. Location: Hoa Binh School Building. Ward 19. Contact agency: People’s Committee of Binh Thanh District.

23. Resettlement Apartment Building No. 2 Le Quang Dinh, Ward 14. Location: Apartment No. 2 Le Quang Dinh, Ward 14. Contact agency: People’s Committee of Binh Thanh District.

24. Building new headquarters of District Committee, Hoc Mon District People’s Committee. Location: Hoc Mon Town; Investment form: PPP. Total capital: 139 Billion VND / 6 Million USD. Contact agency: Hoc Mon district construction investment management board.

25. Resettlement Housing in the alley 23 Tran Van Ky, Ward 14. Location: Residential building alley 23 Tran Van Ky, Ward 14. Contact agency: People’s Committee of Binh Thanh District.

26. Head office: Department of Agriculture and Rural Development. Location: No. 176 Hai Ba Trung Street and 186 Nguyen Van Thu Street, District 1. Construction scale: 1,420m2. Investment form: PPP. Total capital: 211 Billion VND / 10 Million USD. Contact agency: Department of Agriculture and Rural Development.

27. Resettlement Railway apartment building 28 Pham Viet Chanh, ward 19. Location: Railway apartment building 28 Pham Viet Chanh, Ward 19. Contact agency: People’s Committee of Binh Thanh District.

28. Sports Zone. Location: No. 2374, Highway 1, Trung My Tay Ward, District 12. Investment form: PPP. Total capital: 30 Billion VND / 1 Million USD. Contact agency: Biotechnology Center.

29. Resettlement Apartment 4b Xô Viết Nghệ Tĩnh, ward 19. Location: Apartment 4B Xô Viết Nghệ Tĩnh, Ward 19. Contact agency: People’s Committee of Bình Thạnh District.

 XI: 14 EDUCATION PROJECT

1. Project of converting Kindergarten, Primary and Secondary schools in Ward 4 to renovate urban areas and build high-rise apartment buildings. Location: Ward 4, District 8. Investment form: FDI and other forms. Total capital: 3,010 Billion VND / 137 Million USD. Contact agency: District 8 People’s Committee.

2. The University-College relocation project. Location: Northwest urban area. Investment form: Socialization. Contact agency: Management Board of Northwest Urban Area.

3. Constructing Preschool in the building area of ​​Ung Thanh Company. Location: Ward 7, District 8. Investment form: Socialization. Contact agency: District 8 People’s Committee.

4. Kindergarten 15 (junior 2), Go Vap district. Location: Ward 15, Go Vap District. Total capital: 36 Billion VND / 2 Million USD. Contact agency: Go Vap District Construction Investment Management Board.

 5. Constructing Preschools at Minh Son’s house. Location: Ward 7, District 8. Investment form: Socialization. Contact agency: District 8 People’s Committee

6. International standard schools (at lottery 3-4, under functional zone No. 3). Location: Thu Thiem New Urban Area, District 2, Ho Chi Minh City. Form of investment: in the form of auction of land use rights. Contact agency: Thu Thiem New Urban Area Investment and Construction Management Board, District 2.

 7. Construction of Preschools in Ward 1. Location: Ward 1, District 8. Investment form: Socialization. Contact agency: District 8 People’s Committee.

8. International standard schools (at the lot of land signs 4-1; belonging to functional zone No. 4). Location: Thu Thiem New Urban Area, District 2, Ho Chi Minh City. Form of investment: in the form of auction of land use rights. Contact agency: Thu Thiem New Urban Area Investment and Construction Management Board, District 2.

9. International standard school (at lottery 4-6, belonging to Function Area 4). Location: Thu Thiem New Urban Area, District 2, Ho Chi Minh City. Form of investment: in the form of auction of land use rights. Contact agency: Thu Thiem New Urban Area Investment and Construction Management Board, District 2.

10. Education Zone Project 44.26 ha. Location: Northwest urban area. Construction scale: Status of land not yet compensated for ground clearance. Investment form: PPP, Socialization and other forms. Contact agency: Management Board of Northwest Urban Area.

11. International standard school (in lottery 4-15; Functional Area No. 4). Location: Thu Thiem New Urban Area, District 2, Ho Chi Minh City. Contact agency: Thu Thiem New Urban Area Investment and Construction Management Board, District 2.

 12. Education Zone Project 85.26ha. Location: Northwest urban area. Construction scale: Status of land not yet compensated for ground clearance. Investment form: PPP, Socialization and other forms. Contact agency: Management Board of Northwest Urban Area.

13. Head of Primary Tran Van Kieu Ward 10. Location: 150 Vanh Dai Street, Ward 10, District 6. Contact Agency: District 6 People’s Committee.

14. Hung Long University Urban Area. Location: Hung Long Commune, Binh Chan District. Contact agency: South Zone Management Board.

XII: 6 Investment project in Health

 1. Building a hospital complex. Location: Northwest urban area. Investment form: Socialization. Contact agency: Management Board of Northwest Urban Area.

2. Building an examination and treatment area in Zone 2 of Nguyen Tri Phuong Hospital. Location: 468 Nguyen Trai, Ward 8, District 5. Investment form: PPP. Total capital: 1,000 Billion VND / 50 Million USD.

3. District 2. Hospital Location: in the campus of District 2 Hospital, 130 Le Van Thinh, Binh Trung Tay Ward, District 2. Investment form: PPP Total capital: 328 Billion VND / 14 Million USD.

4. Hospitals in Tan Kien Medical Complex – Binh Chanh. Construction scale: 73 ha. Total capital: 10,600 Billion VND / 482 Million USD. Contact agency: HCMC Department of Health.

 5. District 3. Hospital Location: 114-116-118 Tran Quoc Thao, Ward 7, District 3. Investment form: PPP. Total capital: 361 Billion VND / 16 Million USD.

6. Investment project to build a new Treatment Area – Zone F – Thu Duc District Hospital. Location: Thu Duc District Hospital, Số 29, Đường Phú Châu, Quarter 5, Tam Phú Ward, Thủ Đức District. Investment form: PPP. Total capital: 790 Billion VND / 36 Million USD.

XIII: 15 CULTURE – SPORTS PROJECT

1. Planning to build Rach Chiec National Sports Complex. Location: District 2. Investment form: FDI and other forms. Total capital: 21,200 Billion VND / 964 Million USD. Contact agency: Rach Chiec Sports Center.

2. The stadium in the athletics department’s 10,000 seats. Location: An Phu Ward, District 2. Investment form: PPP. Total capital: 601 Billion VND / 27 Million USD. Contact agency: Department of Culture and Sports.

3. Project to upgrade and expand the City General Museum. Location: National Cultural History Park, District 9, HCMC. Investment form: PPP. Total capital: 1,447 Billion VND / 66 Million USD. Contact agency: Management Board of Construction Investment Projects – Department of Culture and Information.

 4. General sports gym. Location: An Phu Ward, District 2. Investment form: PPP. Total capital: 2,185 Billion VND / 99 Million USD. Contact agency: Department of Culture and Sports.

5. Repairing Phu Lam pool in District 6. Location: No. 157 Kinh Duong Vuong, Ward 12, District 6. Investment form: PPP. Total capital: 35,020 Billion VND / 1,592 Million USD. Contact agency: Management Board of Construction Investment Projects – Department of Culture and Information.

6. Long Chao cycling stadium. Location: An Phu Ward, District 2. Investment form: PPP. Total capital: 1,991 Billion VND / 91 Million USD. Contact agency: Department of Culture and Sports.

7. Investment project of Go Vap Cultural Park. Location: No. 1 Nguyen Van Luong, Ward 6, Go Vap District, Ho Chi Minh City. Total capital: 500 Billion VND / 23 Million USD. Contact agency: Management Board of Construction Investment Projects – Department of Culture and Information.

8. Swimming pool + Jumping Bridge. Location: An Phu Ward, District 2. Investment form: PPP. Total capital: 1,365 Billion VND / 62 Million USD. Contact agency: Department of Culture and Sports.

9. 50,000-seat stadium. Location: An Phu Ward, District 2. Investment form: PPP. Total capital: 2,844 Billion VND / 129 Million USD. Contact agency: Department of Culture and Sports.

10. Shooting and Archery Cluster. Location: An Phu Ward, District 2. Investment form: PPP. Total capital: 67 Billion VND / 3 Million USD. Contact agency: Department of Culture and Sports.

11. Outdoor football field. Location: An Phu Ward, District 2. Investment form: PPP. Total capital: 969.9 Billion VND / 44 Million USD. Contact agency: Department of Culture and Sports.

12. Center for Exhibition Conference, Hotel Complex at Lot No. 1-12 and 1-20 belonging to Function Area No. 1. Location: District 2. Investment form: in the form of auction of rights land use. Contact agency: Management Board of Thu Thiem Area.

13. Water Sports Area. Location: 215A Ly Thuong Kiet, District 11. Investment form: PPP Contact agency: Department of Culture and Sports.

14. Multipurpose Art Performance Center at Lot No. 3-17 of Function Area No. 3. Location: District 2. Investment form: in the form of auction of land use rights. Contact agency: Management Board of Thu Thiem Area.

15. Martial Arts Center. Location: 4 Le Dai Hanh, District 11. Investment form: PPP. Contact agency: Department of Culture and Sports.

 XIV: 14 TOURISM – ENTERTAINMENT INVESTMENT PROJECTS

 1. Urban resort hotel project at Lot 7-1 of functional zone No. 7. Location: Thu Thiem New Urban Area, District 2, Ho Chi Minh City. Construction scale: – Area: 74.393.40 m2 – Construction floor area is about 100,000 m2. Form of investment: in the form of auction of land use rights. Contact agency: Management Board of Thu Thiem Area.

2. Truong Son forest regeneration area (Zone IV – Cultural Park of Historical Park – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 120 Billion VND / 5 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

3. Saigon Safari Park. Location: Cu Chi District. Construction scale: Clean land, already approved by 1/2 1/2000. Contact agency: Department of Planning and Investment.

4. Village of Vietnamese Ethnic Culture (area IV – Cultural Park of Historical Park – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 50 Billion VND / 2 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

5. Recreation and Public Service Area (Zone I – Ancient Park of Historical Park – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 380 Billion VND / 17 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

6. Cinema Park Area (Zone IV – Cultural Park Historical Area – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 500 Billion VND / 23 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

7. Outdoor Sports Zone (Zone IV – Cultural Park of Historical Park – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Contact agency: Management Board of National Historical and Cultural Park.

8. Adventure Park and Hoa Binh Square (Zone IV – Historical Park Cultural Area – National Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 430 Billion VND / 20 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

9. Area of ​​cable car-river food service area (Zone IV – Historical Park Cultural Area – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 130 Billion VND / 6 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

10. Public Service Area (Zone IV – Cultural Park of Historical Park – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 100 Billion VND / 5 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

11. Hoa Vien Park (Zone IV – Cultural Park of Historical Park – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 100 Billion VND / 5 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

12. Mineral Spring Flower Village Area (Zone IV – Cultural Park of Historical Park – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 400 Billion VND / 18 Million USD. Contact agency: Management Board of National Historical and Cultural Park.

13. Park in the south of Mai Chi Tho Street at DI-6 lot. Location: District 2. Scale: 4.1 ha. Contact agency: Management Board of Thu Thiem Area.

14. Area of ​​low-rise accommodation (Zone IV – Cultural Park of Historical Park – Ethnic Culture). Location: Historical Park – Ethnic Culture. Investment forms: BOT, BCC and other forms. Total capital: 500 Billion VND / 23 Million USD. Contact agency: Management Board of National Historical and Cultural Park.